iOS · Works with Apple Health

Train smarter.
Recover better.

SimpEx reads your body's daily readiness — HRV, resting heart rate, and sleep — and builds the right workout for today, with the equipment you actually have.

SimpEx home screen showing a readiness score of 100, HRV and resting heart rate, and a Build Today's Workout button
  • Built on Apple Health

    HRV, sleep & heart rate, read-only

  • Works without a watch

    iPhone alone is enough; Apple Watch, Whoop & Ultrahuman data synced to Apple Health make it sharper

  • 3,000+ exercises

    with video demonstrations

  • 10+ training styles

    strength, HIIT, CrossFit, yoga, boxing & more

AI workout builder

Your workout, built in seconds.

AI generates complete sessions — warm-up, main work, cool-down — and it only uses equipment you actually have.

Home with just a mat? Real bodyweight session. Full gym? Everything's on the table. Scan your equipment with the camera if you don't feel like typing.

A generated SimpEx workout with sets, reps, rest and exercise videos

Readiness

Know when to push. Know when to rest.

Every morning SimpEx scores your recovery from HRV, resting heart rate and sleep, and matches today's intensity to it.

Not a fixed template — your body sets the pace.

Today's readiness

Scoring…
0of 100
  • HRV

    68ms

  • Sleep

    7h 40m

  • Resting HR

    52

You're well recovered — today is a day to push.

AI coach

An AI coach that doesn't just talk.

Ask mid-workout and it acts — “Swap the rows for dips.” “Add barbell curls.” “My lower back hurts, what instead?”

It edits your workout on the spot, respecting your equipment and your body.

SimpEx AI coach chat swapping decline barbell bench press for dumbbell bench press

Challenges & progress

Beat your own scoreboard.

Benchmark challenges like Cindy in guided mode — countdown, round counter, result saved to your personal scoreboard.

Every workout feeds your charts, records and streak calendar.

Bench press · 12 weeks

Best set weight per session

▲ +20 kg
60 kg70 kg80 kgWk 1Wk 4Wk 8Wk 12
The Cindy benchmark challenge in guided mode with a 20 minute time cap

A look inside

Every screen, built for the gym floor.

Home screen with readiness card and streak
Home
Generated workout with exercise videos
AI workout
Cindy benchmark challenge guided screen
Challenges
AI coach chat swapping an exercise
AI coach
Workout builder with location, type, muscle group and goal
Builder
Strength records and progress chart
Progress
Workout log with streak and activity calendar
Calendar

Training goals

Pick the goal. SimpEx programs the rest.

  • Strength

    3–6 reps

    3–5 min rest

    heavy compound lifts

  • Hypertrophy

    8–12 reps

    60–90s rest

    volume focus

  • Endurance

    15+ reps

    30–45s rest

    conditioning

SimpEx programs sets, reps and rest to match your goal.

FAQ

Questions, answered.

  • No. SimpEx reads from Apple Health, so iPhone alone works. If you wear an Apple Watch, Whoop, or Ultrahuman Ring, that data makes your readiness score sharper.

Pricing

Start free. Go Pro when your training does.

Free

$0

Everything you need to train and track.

  • Build & track workouts
  • 3,000+ exercise library with videos
  • Progress charts & records
  • Readiness score
Download on the App Store
Most popular

Pro

$9.99/month

or $89.99/yearSave 25%

  • Unlimited AI workout generation
  • All training styles
  • Marathon plans
  • AI injury adaptation
  • Equipment scanner
Download on the App Store

Billed through your Apple ID. Cancel anytime.

Your best workout starts today.

Download SimpEx and let your body set the pace.

Download on the App Store